residential column concrete formwork
Home » Products » Universal Plastic Formwork » Pipe Gallery Tunnel Template » Pipe Gallery Tunnel Formwork

Pipe Gallery Tunnel Formwork

Availability:
Quantity:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

31


Pipe gallery Tunnel formwork is a system of formwork that can be used during a normal cycle to cast the walls and formwork of a program. This system produces effective load-bearing structures that are widely used. The tunnel formwork space spans 2.4-2.6 meters, making it easier to subdivide and build smaller spaces.


Tunnel formwork system is used in the production of buildings like housing, jail houses, and student hostels which have monolitic structure. Depending on the size of the structure, tunnel formwork system provides casting of a fl oor in 2 days or in a single day. The buildings which produced by tunnel formwork system are cost efficient, resistant to earthquake, have minimal level of production fl aws and have reduced fi ne-structure labor costs. Tunnel formwork system is preferred for military buildings as well.


The characteristics of the Pipe gallery tunnel formwork.

Building
The formwork is specially adapted for each project. The repetitive nature of the system and the use of prefabricated forms and reinforcing mats/cages simplifies the whole construction process, producing a smooth and fast operation. The techniques used are already familiar to the industry, but with tunnel form construction there is less reliance on skilled labour.


Quality
Quality is enhanced despite the speed of construction. The precise, even steel face of the formwork creates a smooth, high quality finish capable of receiving direct decoration with the minimum of preparation (a skim coat may be required). This reduces the requirement for following trades, thus providing additional cost savings and speeding the entire process.


Design
The large bays constructed using tunnel form provide exceptional flexibility in the design and layout of the building and allow a high degree of freedom in the final appearance.


Safety
Tunnel form has integral working platforms and edge protection systems. In addition, the repetitive, predictable nature of the tasks involved encourages familiarity with operations, and, once training is complete, productivity improves as construction progresses. The minimal requirement for tools and equipment when moving the tunnel form further reduces the risk of accidents on site.


32


Application scenarios

33


34

35

Company Profile

Our company is a professional modular plastic formwork manufacturer,it was founded in 2003 and has 80 workers,covers 50000 square meters.It is located in Jiaxing that is near to Shanghai.

Our main product is plastic mould,we also have highway mould,high speed railway mould,slope protection mould,plastic turnover box and so on.There are more than 10 sets of small injection moulding machines ranging from 300 to 50000 grams, with a strong production and supply capacity.

Our factory has own mould research and development center.You can customize what you need.

We have achieved a lot of reputation,such as HI-TECH enterprises and SMEs IN Specialised New Sectors.Molds of the company have been widely and successfully used in many national key projects in China, and have been well received.  In addition, our plastic molds have been sold overseas and have been successfully applied in railway construction projects in Kenya, Ethiopia, Vietnam.

If you are satisfied with our plastic template, you can order directly or consult plastic template related issues. We will provide you with the best plastic formwork products and services. We are happy to cooperate with you and bring you satisfactory products.


292293


FAQ

Q1.Are you a factory or trading company?
A1:We are a factory.

Q2.How can I get your quotation?
A2.You can send us your project structural drawing or the material list for a quotation. Our engineer team will give your formwork solution.

Q3.What is the Payment term?
A3:T/T or L/C at sight. 30% Deposit for start the production ,the balance before the shipment when goods are ready.

Q4.How long is our Production leading time?
A4:within 15-20 days upon receive deposit in normal season, and 25-30days in our busy time(August,September,October).

Q5.What is the package method?
A5:Our products are usually packed in bulk and on pallets which suits to container transportation.

Q6: Do you have any guarantee on the quality?
A6:We guarantee the quality of different products. If necessary, you can arrange a third-party company to inspect the product quality in our factory.

Q7: What benefits can you offer us?
A7:We can provide you with perfect service, including design, production, delivery and after-sales, good product quality and reasonable price.

Q8: Are you looking for agent or distributor in our country?
A8:Yes, we are looking for an agent or distributor worldwide based on a win-win relationship.

Q9.What is the Trade Term?
A9:Ex-work factory , FOB Shanghai, FOB Ningbo.


Previous: 
Next: 

ABOUT US

Our company is a professional modular plastic template manufacturer, founded in 2003, the existing staff of about 80 people, covering an area of about 50,000 square meters. It is located in Jiaxing, near Shanghai.

QUICK LINKS

PRODUCT CATEGORY

SEND US A MESSAGE
Copyright © 2025 Jiaxing Wangzu Industrial Co.,Ltd All Rights Reserved.Sitemap 浙ICP备2024067440号-3