residential column concrete formwork
Home » Products » Plastic Modular Formwork System » Wall Plastic Formwork » WANGZU 8cm Modular Plastic Formwork for Tunnel Drainage Ditch Construction

WANGZU 8cm Modular Plastic Formwork for Tunnel Drainage Ditch Construction

1) What Is It
WANGZU tunnel drainage ditch formwork is a modular plastic forming system for cast-in-place concrete ditches inside tunnels. It supports linear
construction with standard panels and a full set of supporting accessories, providing stable and accurate molding for tunnel drainage structures.
2) Key Advantages
Full size series, customizable for different tunnel ditch dimensions

Lightweight and easy for manual handling
Reusable ≥100 times, greatly reducing material cost
High rigidity, anti-bulging and deformation-resistant
Smooth surface for easy demolding and clean finish
Complete accessory system for fast assembly
Waterproof and corrosion-resistant for underground use
Eco-friendly and recyclable
High splicing precision to avoid slurry leakage
Main Board:
Material:
Availability:
Quantity:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
  • tunnel drainage ditch formwork

  • Wangzu

  • TDDF

Product Video:



Product Advantages:

Feature Plastic Tunnel Drainage Ditch Formwork Wood Formwork Steel Formwork
Material High-strength engineering PP or ABS composite Solid wood, easy to crack/rot, high water absorption Heavy steel, prone to rust, poor corrosion resistance
Construction Lightweight for manual handling, no heavy machinery required; modular design for fast linear assembly, zero slurry leakage Needs on-site cutting and nailing, joints leak easily, high damage rate, labor-intensive Extremely heavy, requires lifting equipment, complex bracing, low construction efficiency
Reusability

≥100 times under normal construction, consistent performance across cycles

5-8 times, prone to damage and deformation after use 30-50 times, high risk of deformation and fatigue damage
Surface Finish Smooth, high-precision forming, no secondary plastering required Rough, uneven surface, mandatory plastering and grinding Smooth but prone to rust stains, requires surface treatment
Water Resistance Excellent, zero water absorption, no swelling or rotting Poor, high water absorption, easy to rot and deform Good but prone to corrosion, requires regular anti-rust treatment
Overall Cost Performance Excellent, lowest total cost of ownership (TCO) Poor, high long-term material and labor cost Medium, high upfront and maintenance cost
Supporting Services Complete set of matching accessories + professional technical support No supporting accessories or technical services Simple accessories, no professional technical support
Modularity Full accessories, freely splicable, highly adaptable to linear tunnel ditch structures Fixed size, no standard modular system, poor adaptability Standard panels, heavy, limited splicing flexibility
Eco-Friendly Eco-friendly, recyclable, zero wood consumption High, deforestation and material waste Recyclable but high production energy cost
Technical Parameters:
Technical Parameters Specification Description
Material High-strength engineering PP or ABS Impact-resistant rigid plastic specially formulated for underground tunnel moisture and side pressure conditions
Application Tunnel drainage ditch & linear concrete construction Mainly used for cast-in-place tunnel drainage ditches, culverts and linear underground concrete structures
Standard Modular Size

Full modular size series for tunnel use

Includes 30×25×8cm, 45×30×8cm, 150×60×8cm, 150×90×8cm, 150×100×8cm; full customization available
Load Bearing Capacity Excellent load-bearing performance High structural rigidity, strong side pressure resistance, no bulging or deformation during concrete pouring
Surface Type Smooth anti-adhesion tunnel finish surface No mortar adhesion, easy demoulding; reduces tunnel inner wall post-finish repair work
Temperature Resistance -20℃ to 60℃ Wide operating temperature range, suitable for cold, temperate and hot climate construction
Splicing Accuracy High splicing precision Tight splicing to prevent slurry leakage, ensure straight linearity of tunnel ditches
Accessory System Complete full set of accessories We provide adjusting blocks, connecting blocks, handles, locking parts and other full system accessories
MOQ 100㎡, trial order negotiable Flexible MOQ policy to support small-scale trial projects and large-scale bulk orders
Lead Time 7-15 days for customized Stable production, can match project schedule


Application Cases:
Plastic Tunnel Drainage Ditch Formwork

Plastic Tunnel Drainage Ditch Formwork

Tunnel Drainage Ditch Formwork

Plastic Tunnel Drainage Ditch Formwork


Using Effect:
  • Straight Linear Forming Without Secondary Repair

    High-precision modular splicing ensures straight tunnel ditch lines, eliminating post-pouring plastering and repair work, saving labor and materials.

  • Fast Linear Assembly for Long Tunnel Projects

    Lightweight panels and complete accessory system accelerate on-site assembly, improving construction efficiency by over 35% for long-distance tunnel drainage projects.

  • High Reusability Reduces Long-Term Material Cost

    Reusable ≥100 times, it greatly lowers material consumption and replacement cost, especially suitable for large-scale tunnel ditch projects.

  • Anti-Bulging & Deformation-Resistant Under Concrete Pressure

    Reinforced internal grid structure resists concrete lateral pressure, ensuring uniform wall thickness and stable forming without bulging.

  • Smooth Surface Reduces Post-Pouring Workload

    Non-stick smooth surface delivers clean concrete finish with minimal bubbles, reducing cleaning and grinding work inside tunnels.

  • Durable for Underground Humid Environments

    Excellent waterproof and corrosion resistance, suitable for long-term buried tunnel drainage systems, extending service life.

FAQ:

Q1: Are you a factory or trading company?

A1: We are a factory.


Q2: How can I get your quotation?

A2: You can send us your project structural drawing or material list for a quotation. Our engineer team will provide you with a professional formwork solution.


Q3: What are your payment terms?

A3: We accept T/T or L/C at sight. 30% deposit to start production, balance to be paid before shipment when goods are ready.


Q4: How long is your production lead time?

A4: Normally 15–20 days after receiving the deposit. During busy season (August, September, October), it will be 25–30 days.


Q5: What is your packaging method?

A5: Our products are usually packed in bulk or on pallets, suitable for container transportation.


Q6: Do you provide any quality guarantee?

A6: Yes, we guarantee product quality. If necessary, you can arrange a third-party company to inspect the goods in our factory.


Q7: What benefits can you offer us?

A7: We can provide comprehensive services including design, production, delivery and after-sales support, together with good product quality and reasonable prices.


Q8: Are you looking for agents or distributors in our country?

A8: Yes, we are looking for agents and distributors worldwide based on win-win cooperation.


Q9: What trade terms do you offer?
A9: EXW, FOB Shanghai, FOB Ningbo.



Previous: 
Next: 

ABOUT US

Our company is a professional modular plastic template manufacturer, founded in 2003, the existing staff of about 80 people, covering an area of about 50,000 square meters. It is located in Jiaxing, near Shanghai.

QUICK LINKS

PRODUCT CATEGORY

SEND US A MESSAGE
Copyright © 2025 Jiaxing Wangzu Industrial Co.,Ltd All Rights Reserved.Sitemap 浙ICP备2024067440号-3