| Size: | |
|---|---|
| Material: | |
| Availability: | |
| Quantity: | |
modular slope protection formwork
Wangzu
mspf
Product Advantages:
| Feature | Plastic Arch Formwork | Wood Formwork | Steel Formwork |
| Material | High-strength composite, waterproof, corrosion-resistant, stable in extreme temps | Solid wood, easy to crack/rot, high water absorption | Heavy steel, prone to rust, poor corrosion resistance |
| Construction | Lightweight, no heavy machinery, interlocking design (no leakage), quick arch assembly | Needs on-site cutting, joints leak easily, poor arch adaptability | Extremely heavy, needs lifting equipment, hard to shape arches |
| Modularity | Full accessories, freely splicable to any arch radius (R125/R150/R300cm)Customizable | Fixed size, no standard parts, cannot adjust arch radius | Standard panels, heavy, limited flexibility for curved shapes |
| Lifespan | Reusable 100+times, 5-8 year lifespan, low maintenance | Reusable 8-15 times, 1-2 year lifespan, high waste | Reusable 30-50 times, 3-5 year lifespan, high rust/maintenance cost |
| Cost | Moderate upfront cost, long-term cost-effective | Low upfront cost, high labor/waste cost | High upfront cost, high transport/labor cost |
| Eco-Friendly | 100% recyclable, no construction waste | 100% recyclable, no construction waste | Recyclable but high production energy cost |
| Technical Parameters | Specification | Description |
| Material | High-strength engineering plastic | Eco-friendly, non-toxic, good toughness, high strength, waterproof, corrosion-resistant, reusable |
| Application | Arch-shaped concrete slope protection (railway/highway slopes, tunnel entrances, water conservancy projects) | Specialized for slope stabilization & drainage, adaptable to various infrastructure slope protection projects |
| Regular Panel Size | R125cm / R150cm / R300cm/R167cm/R200cm (customizable) | Multiple standard radii available; custom radii & cross-sections per project drawings |
| Accessory System | Curved arch panels, skeleton side panels, arc pressing strips, connecting blocks, adjusting blocks, locking handles | Complete accessory set, freely splicable like building blocks to form any arch structure |
| Wall Thickness | 5cm (customizable 5-8cm) | Standard 5cm thickness for slope projects; adjustable to meet different pouring pressure requirements |
| Weight | According to actual size | Lightweight, easy to carry, install and remove manually |
| Reuse Times | 100+ times | Reusable with normal maintenance, cost-effective |
| MOQ | Low MOQ for standard arch components | Small orders accepted; bulk orders enjoy better pricing |
| Lead Time | 7-15 days for customized | Stable production, can match project schedule |
Herringbone Skeleton Formwork
Slope protection construction site
Arch slope protection forming effect
Transportation Engineering: Highway embankments, railway slopes, tunnel entrances, and bridge approach protection. Specialized for casting concrete arch skeletons to stabilize soil and prevent landslides.
Municipal Infrastructure: Urban drainage ditch slopes, flood control embankments, and sidewalk retaining walls. Adapts to complex arch structures for long-term outdoor durability.
Water Conservancy Projects: Canal slopes, reservoir embankments, and waterway revetments. Waterproof and corrosion-resistant, ideal for humid and water-immersed environments.
Landscape & Garden: Landscape arch retaining walls, garden walkway borders, and park slope decoration. Smooth finished surfaces with a neat, natural look.
Precise Arch Forming: Specialized interlocking design ensures accurate arch radius and shape, no slurry leakage or mold expansion, achieving perfect slope protection structures.
High Construction Efficiency: Lightweight design for easy manual handling. Splicing is 30% faster than steel formwork, reducing labor costs and shortening project duration for slope projects.
Long-Term Cost Savings: Reusable 50-100 times, with normal maintenance. The single-use cost is only 60% of steel, significantly reducing material waste and overall project expenses.
Stable Slope Stability: High-strength engineering plastic material provides strong anti-deformation ability, ensuring the concrete arch skeleton has excellent load-bearing capacity and long-term slope stability.
Eco-Friendly & Low Maintenance: 100% recyclable, no toxic materials. Requires minimal upkeep and complies with green construction standards for infrastructure projects.
Q1: Are you a factory or trading company?
A1: We are a factory.
A2: You can send us your project structural drawing or material list for a quotation. Our engineer team will provide you with a professional formwork solution.
Q3: What are your payment terms?
A3: We accept T/T or L/C at sight. 30% deposit to start production, balance to be paid before shipment when goods are ready.
A4: Normally 15–20 days after receiving the deposit. During busy season (August, September, October), it will be 25–30 days.
A5: Our products are usually packed in bulk or on pallets, suitable for container transportation.
A6: Yes, we guarantee product quality. If necessary, you can arrange a third-party company to inspect the goods in our factory.
A7: We can provide comprehensive services including design, production, delivery and after-sales support, together with good product quality and reasonable prices.
A8: Yes, we are looking for agents and distributors worldwide based on win-win cooperation.